SPD-260913
Miller residence
Customer: Miller
9955 Stuart Rd, San Antonio, TX 78263 · Bexar County
Rig status
VERIFY
Preliminary determination
Rules & stop explanation
The exact entered facts, regulatory requirement, missing evidence, and release effect behind every result.
Jurisdiction verification
TWDB match: Edwards Aquifer Authority · GMA 13
The job point intersects both TWDB polygons. The job remains in VERIFY status until staff confirms jurisdiction and identifies the applicable EAA approval pathway. Evergreen UWCD does not apply to this point.
Open TWDB Groundwater Data ViewerGroundwater authority
EAA
Management area
GMA 13
Open hard stops
0
County
Bexar
Rule breakdown
2 review layersEdwards Aquifer Authority boundary match
verifyTWDB GIS - EAA · Jurisdiction gate · Location / jurisdiction
Edwards Aquifer Authority boundary match
verifyTWDB GIS - EAA · Jurisdiction gate · Location / jurisdiction
TWDB's administrative-boundary service places the job point inside the Edwards Aquifer Authority polygon and Groundwater Management Area 13. The GIS result is a screening assignment, not a legal boundary determination.
Facts that triggered this review
Matched address: 9955 Stuart Rd, San Antonio, TX 78263
Geocoded point: 29.324356, -98.294502
County result: Bexar County
TWDB GCD layer result: Edwards Aquifer Authority
TWDB GMA layer result: GMA 13
What the rule requires
Confirm the mapped authority against the current legal boundary and determine which EAA well-construction or withdrawal pathway applies.
Why it is not satisfied
Staff confirmation of the TWDB boundary match and EAA pathway is not yet recorded.
What clears this item
Review the point in the TWDB viewer, document verification, then evaluate current official EAA rules and approvals.
Rule status
Screening control
Effective
Current GIS screening control
Last verified
September 11, 2026
Blocks rig release
No — verification
State water-well construction standards
verifyTDLR · 16 TAC Chapter 76 · Construction / completion reporting
State water-well construction standards
verifyTDLR · 16 TAC Chapter 76 · Construction / completion reporting
Texas licensing, construction, and reporting requirements remain a separate regulatory layer even when a local district pathway may be exempt.
Facts that triggered this review
Job is a proposed Texas water well
Well is entered as new construction
What the rule requires
Confirm the licensed driller, applicable construction standards, and completion-report responsibilities before work begins.
Why it is not satisfied
Driller and reporting workflow have not yet been confirmed in this preliminary record.
What clears this item
Assign the licensed driller and complete the state construction and reporting review.
Rule status
Screening control
Effective
Current adopted chapter
Last verified
September 8, 2026
Blocks rig release
No — verification
How the decision is made
Match authority
GIS suggests jurisdiction; staff confirms it.
Evaluate facts
Facts are tested only against adopted rules.
Check evidence
Required approvals must be present.
Manual release
Authorized staff records the rig decision.
Operational screening only. This is not a legal boundary survey or legal opinion. Where jurisdiction, ownership, aquifer classification, exemption status, or interpretation is uncertain, obtain written confirmation from the applicable authority before drilling.
Section changes
Save before switching sections.