SPD-260914

Miller residence

Customer: Miller

9955 Stuart Rd, San Antonio, TX 78263 · Bexar County

Rig status

VERIFY

Preliminary determination

Rules & stop explanation

The exact entered facts, regulatory requirement, missing evidence, and release effect behind every result.

Jurisdiction verification

TWDB match: Edwards Aquifer Authority · GMA 13

The job point intersects both TWDB polygons. The job remains in VERIFY status until staff confirms jurisdiction and identifies the applicable EAA approval pathway. Evergreen UWCD does not apply to this point.

Open TWDB Groundwater Data Viewer

Groundwater authority

EAA

Management area

GMA 13

Open hard stops

0

County

Bexar

Rule breakdown

2 review layers

Edwards Aquifer Authority boundary match

verify

TWDB GIS - EAA · Jurisdiction gate · Location / jurisdiction

TWDB's administrative-boundary service places the job point inside the Edwards Aquifer Authority polygon and Groundwater Management Area 13. The GIS result is a screening assignment, not a legal boundary determination.

Facts that triggered this review

Matched address: 9955 Stuart Rd, San Antonio, TX 78263

Geocoded point: 29.324356, -98.294502

County result: Bexar County

TWDB GCD layer result: Edwards Aquifer Authority

TWDB GMA layer result: GMA 13

What the rule requires

Confirm the mapped authority against the current legal boundary and determine which EAA well-construction or withdrawal pathway applies.

Why it is not satisfied

Staff confirmation of the TWDB boundary match and EAA pathway is not yet recorded.

What clears this item

Review the point in the TWDB viewer, document verification, then evaluate current official EAA rules and approvals.

Rule status

Screening control

Effective

Current GIS screening control

Last verified

September 11, 2026

Blocks rig release

No — verification

Official source: Link intentionally withheld until staff verifies and stores the source URL. The system must never invent a citation.

State water-well construction standards

verify

TDLR · 16 TAC Chapter 76 · Construction / completion reporting

Texas licensing, construction, and reporting requirements remain a separate regulatory layer even when a local district pathway may be exempt.

Facts that triggered this review

Job is a proposed Texas water well

Well is entered as new construction

What the rule requires

Confirm the licensed driller, applicable construction standards, and completion-report responsibilities before work begins.

Why it is not satisfied

Driller and reporting workflow have not yet been confirmed in this preliminary record.

What clears this item

Assign the licensed driller and complete the state construction and reporting review.

Rule status

Screening control

Effective

Current adopted chapter

Last verified

September 8, 2026

Blocks rig release

No — verification

Official source: Link intentionally withheld until staff verifies and stores the source URL. The system must never invent a citation.

How the decision is made

1

Match authority

GIS suggests jurisdiction; staff confirms it.

2

Evaluate facts

Facts are tested only against adopted rules.

3

Check evidence

Required approvals must be present.

4

Manual release

Authorized staff records the rig decision.

Operational screening only. This is not a legal boundary survey or legal opinion. Where jurisdiction, ownership, aquifer classification, exemption status, or interpretation is uncertain, obtain written confirmation from the applicable authority before drilling.

Section changes

Save before switching sections.